Posted: Tue Sep 24, 2013 8:44 am Post subject: Phase 1 front subframe jig |
|
|
During a conversation with Ron Scarfe at the Manchester classic car show the subject of the phase 1 subframe jig came up, I am aiming to have the jig available for the next Rochdale Owners Club AGM, at which point new frames can be made for anyone requiring them.
In the first instance I would suggest contacting John Plant to express your interest should you require a new frame. |
|
Back to top |
|
|
keith hamer Site Admin
Joined: 28 Jan 2006 Posts: 313 Location: Ellesmere Port
|
Posted: Fri Jan 24, 2014 9:36 am Post subject: Rochdale Olympic ph subframe jig |
|
|
The manufacture of the phase one front subframe jig is now well on its way.
Having studied the drawings prepared by Derek during this process I have been wondering how many cars have got the Morris 1000 steering rack fitted as apposed to the more normal Riley 1.5. I have worked on countless Olympics over almost 40 years and have only ever come across 1 car not fitted with the Riley rack.
Just a thought. |
|
Back to top |
|
|
Roy McKnight Registered User
Joined: 30 Jan 2013 Posts: 15 Location: Haslemere Surrey
|
Posted: Sat Jan 25, 2014 7:30 am Post subject: |
|
|
Whats the easiest way to check what rack is fitted Keith |
|
Back to top |
|
|
keith hamer Site Admin
Joined: 28 Jan 2006 Posts: 313 Location: Ellesmere Port
|
Posted: Tue Jan 28, 2014 9:25 am Post subject: rack fitting |
|
|
The Riley rack is fitted using 4 3/8" UNF bolts which tread into the rack bosses at either end of the rack.
If the rack is fitted using 'U' bolts the chances are it is Morris although this is by no means certain as previous owners could have made a change. |
|
Back to top |
|
|
keith hamer Site Admin
Joined: 28 Jan 2006 Posts: 313 Location: Ellesmere Port
|
Posted: Fri Jul 11, 2014 8:35 am Post subject: Phase one subframes |
|
|
I am well on with the manufacture of a batch of Phase one front subframes.
However I am always surprised at the time these things take, should know now having worked on Rochdales for almost 40 years. Each subframe consists of some 33 seperate parts, all of which have to be individually fitted to make up the frame, these are all done now so its a big welding session next week.
The frames should be ready by the end of this month. |
|